Air Dome Data Centers for AI and High-Density Compute

Take the building off your critical path. A Broadwell air-supported data hall is fabricated while your slab, power and cooling go in, then installed in weeks.

Who Builds Data Halls This Way

AI demand has made construction time the constraint. GPUs waiting for a building lose value every month, and in an AI hall the computing equipment can cost several times as much as the facility around it.

AI Capacity Now

Developers and neoclouds with GPUs on order and a building schedule that can't keep up.

Bridge Capacity

Operators who need halls running while permanent buildings are finished, then redeploy the domes.

Power-First Sites

Generation sites, behind-the-meter projects and mining sites converting to AI and HPC, where power arrives before buildings.

Phased Campuses

Campuses where power comes in blocks, so each hall is built when its megawatts are ready.

Also used for edge and regional compute, pilots on short land leases, difficult sites, and equipment and energy halls on the same campus.

Move the Shell Off the Critical Path

Membrane panels, the cable harness, inflation units and doors are fabricated while your site work proceeds. Once the slab, grade beam and anchors are complete, the envelope is installed and inflated, and fit-out starts in a dried-in, conditioned space.

Typical construction sequence, conventional data hall compared with a Broadwell air dome
StepConventional data hallBroadwell air dome
StructureSteel or precast procurement, then erectionMembrane, harness and inflation units fabricated in parallel with site work
Dry-inRoof and walls after the frame is upEnvelope installed and inflated in about two to three weeks after foundations
Fit-out startAfter dry-inAs soon as the dome is inflated and conditioned
Unchanged either wayUtility interconnection, substation, switchgear and generator lead times, IT delivery, commissioning

What Is an Air Dome Data Center?

An air dome data center uses an engineered, air-supported membrane as its building envelope instead of a steel or concrete frame. A steel cable harness over the membrane carries wind and snow loads down to a continuous concrete grade beam at the perimeter.

Cross-section of an air-supported data hallAn insulated air-supported membrane under a steel cable harness, held up by positive internal pressure from N+1 inflation units on backed-up power. Inside, a ground-supported service frame carries busway, cable tray and piping over rack rows with hot-aisle containment and CDUs. The building sits on a grade beam with anchors and a slab on grade, with dry coolers or chillers at grade outside.Air-supported membranewith insulated linerSteel cable harnessGround-supportedservice frame:busway, cable tray,pipingCDUCDURack rows with hot-aisle containmentPOSITIVE INTERNAL PRESSURENo services hang from the membraneN+1 inflationunits onbacked-up powerDry coolers orchillers at gradeGrade beam and anchorsSlab on gradeSchematic, not to scale

Scroll sideways to see the full diagram.

Built up in order: membrane, harness and inflation, service frame, racks, heat rejection.

Inside, it is a conventional data hall: slab on grade, rack rows with containment, liquid cooling and CDUs, busway and cable tray. To fully understand how these systems come together, explore the key components below:

Compared with a conventional hall

  • Clear span

    No column grid shaping rack and containment layout.

  • Nothing on the roof

    Heat rejection and generation sit at grade.

  • One continuous envelope

    A welded membrane under positive pressure, not many joints and penetrations.

  • Redeployable

    Membrane, harness and inflation units can be removed and re-engineered for a new site.

The Questions Your Engineers Will Ask

The four questions that decide whether a fabric building can hold your compute.

  • What keeps the building up if the power fails?

    N+1 inflation units on separate circuits, fed from your UPS- and generator-backed distribution, with three independent pressure sensors alarmed to your BMS.

  • Can we hang anything from the roof?

    No, and you won't need to. Busway, cable tray, piping and lighting ride on a ground-supported service frame. Chillers, dry coolers and generators sit at grade.

  • How is fire protection handled?

    Designed under IBC Section 3102 with an NFPA 701-tested membrane (CAN/ULC-S109 in Canada). Plan on sprinklers laid out for a membrane roof.

  • What wind, snow and seismic loads is it designed for?

    Your site's: ASCE 7 in the US or the National Building Code of Canada, stated on the sealed drawings.

Send Us a Site, a Megawatt Target and a Date

Share your location, initial and ultimate IT load in MW, and target energization date. We'll come back with a concept layout, a budget range and a schedule.

Request a Concept Layout & Budget

Two Starting Points, Sized to Your Site

These concept halls are starting points. Length, width, height, door locations and equipment yards are designed around your site and program.

  • Large compute hall: plan and sectionPlan: 315 by 213 feet. Section: 72 feet high and 213 feet wide, with dashed lines marking the usable width at 16 ft and 24 ft clear height.PLAN315 ft (96 m) long213 ft (65 m) wideSECTION72 ft(22 m)213 ft (65 m) wideUsable widthat 16 ft clear heightUsable widthat 24 ft clear heightConcept only. Final dimensions come from engineering.

    Large Compute Hall

    • Footprint: about 67,100 ft² (6,233 m²)
    • 315 ft long × 213 ft wide × 72 ft high (96 × 65 × 22 m)

    Fits larger GPU clusters, multi-zone deployments and expansion phases of a larger campus.

  • Long compute hall: plan and sectionPlan: 328 by 98 feet. Section: 43 feet high and 98 feet wide, with dashed lines marking the usable width at 16 ft and 24 ft clear height.PLAN328 ft (100 m) long98 ft (30 m) wideSECTION43 ft(13 m)98 ft (30 m) wideUsable widthat 16 ft clear heightUsable widthat 24 ft clear heightConcept only. Final dimensions come from engineering.

    Long Compute Hall

    • Footprint: about 32,200 ft² (2,990 m²)
    • 328 ft long × 98 ft wide × 43 ft high (100 × 30 × 13 m)

    Fits a first GPU deployment, a regional AI facility, or a technical warehouse or support building.

Scroll sideways to see the full diagram.

Concept only. Final dimensions come from engineering.

When Power Is the Constraint

Broadwell and its partner Exax Energy Tech deliver compressed CO2 energy storage (CCES): Exax supplies the technology, and Broadwell builds the gas storage domes. An on-site plant can shift 8 to 10 hours of renewable or off-peak power into your data center's load and, in some configurations, put its waste heat to work.

Explore CO2 Energy Storage
Concept layout: data halls beside a compressed CO2 energy storage plantThe utility grid or on-site generation feeds a substation, and solar and wind charge the storage plant. The substation powers the data halls and charges and discharges the CO2 energy storage plant, which holds a gas storage dome, liquid CO2 storage, thermal storage, and compressors, evaporators and a turbine-generator. Warm water from the data halls flows to the plant, and cooled water returns while the plant discharges.Utility gridor on-site generationSolar and windcharge the storage plantSubstationand switchgearDATA HALLSHall 1Hall 2Hall 3 (future)CO2 ENERGY STORAGE PLANTGas storage domeLiquid CO2 storageThermal storageCompressors, evaporators andturbine-generatorcharge /dischargeWarm waterCooled water back (while the plant discharges)PowerWarm water from the data hallsCooled waterConcept layout, not to scale

Scroll sideways to see the full diagram.

Power reaches the halls and the storage plant; while the plant discharges, cooling water loops between them.

Take the Next Step

Select the stage that best matches where you are in your facility planning journey.

Just Getting Started

Learn How Air Domes Work

  • Clear-span freedom with no interior support columns
  • Redundant inflation on backed-up power
  • Works with any cooling architecture
  • Redeployable to a new site

Ready to learn the basics?

Explore Air Dome Basics

Evaluating Options

Understand the Purchase Process

  • What an air dome costs
  • Each step from engineering to installation
  • What Broadwell supplies and what the buyer handles
  • Ongoing operating costs

Ready to plan the purchase?

View the Purchase Process

Ready to Talk

Discuss Your Project With Our Team

Have these ready:

  • Project location and a site plan or available dimensions
  • Initial and ultimate IT load in MW
  • Target energization date and power status
  • Cooling approach and a geotechnical report, if you have them

Ready to plan your project?

Request a Concept Layout & Budget

Air Dome Data Center FAQ

Quick answers on permits, security, environment, access and schedule.

Take the Building Off Your Critical Path

Send us your site, IT load and target energization date. We'll come back with a concept layout, a budget range and a schedule for the building, including how many halls your power plan supports and where they go.